New production building with vessels and reactors

A completly new three-floor concrete production building needed to be designed. 

Five new stirred stainless steel pressure reactors were required in this concept.

The design also included some intermediate product tanks, connected to the reactors.

Piping from tanks and reactors to the nearby tankfarm was needed

We made sure the nearby, already existing, tankfarm 

A deep vacum system along with condensors, and possibilities for adding solids were part of the scope

Debottlenecking and upgrading of the site utilities 

 

 

 

Year: 
2019