Demolition of the existing cloosed loop air cooling system.
A new 1800 kW water evaporating cooltower was engineerd to extract the heat from the production process.
Cooling water quality is local monitored and additives are dosed when required.
A new concrete socle was poured.
The old pump motors were replaced by new energy efficient ones with frequency drives, controlled by a local PLC
Year:
2013
Related Services: